How do we increase generating capacity?
Plants that burn more, with more expensive fuel
A steam unit around 40 years old burns on the order of 11,500 Btu per kWh; a modern combined cycle, about 6,800. That is close to 70% more fuel per kWh (typical industry values). The measured efficiency of Genera's steam plants, 28.7%, is equivalent to about 11,900 Btu per kWh.
They cover the shortfall and the evening rise in demand. They burn the most fuel per kWh, and they burn diesel.
For October–December 2026, the fuel charge rose 5.95¢ per kWh: uncollected fuel from previous months, baseload units out of service and more diesel, gas that did not arrive, and forced outages.
Midday sun and the evening ramp
Rooftop solar lowers the demand the grid sees by about 900 MW. Baseload plants are large and inflexible: they cannot go below a certain minimum or shut down and restart within hours, so fewer of them are scheduled.
The sun goes down just as consumption rises: the demand the grid sees grows by about 900 MW in 3 hours. The baseload plants that were shut down do not come back in time; peakers burning diesel cover it.
More peaker hours in the evening and a higher fuel charge. Without batteries or flexible plants, part of the savings from solar is lost in the evening.
| How the kWh is produced | Fuel cost per MWh (order of magnitude) |
|---|---|
| Coal | ~$50 |
| Gas in combined cycle | ~$90 |
| Steam with bunker fuel | ~$140 |
| Diesel peaker | ~$230 |
About 2,300 MW, between 2027 and 2030
| Project | MW | When | Status |
|---|---|---|---|
| Utility-scale batteries (includes 430 MW from Genera at six sites) | ~995 | by Dec. 2027 | Underway |
| Utility-scale solar | ~600 | 2027–2028 | Underway, with delays in procurement |
| Energiza: gas combined cycle in San Juan, the first new power plant in decades | 528 | Dec. 2030 (guaranteed date) | Underway |
| New Genera peakers | ~244 | Late 2027 | Underway |
| Temporary generation: 400 MW at Aguirre (contract canceled in August 2026) and 200 MW of floating gas generation at Costa Sur (not approved) | 600 | — | Not counted |
| Hostos: unsolicited proposal to the Public-Private Partnerships Authority | 645–700 | 2031 (proposed) | Not counted: no contract |
| Firm capacity procurement, open to gas, batteries and renewables with batteries (includes up to 600 MW at Costa Sur) | 3,000 | — | Out for bid since Oct. 2025 |
Speed, firmness or no fuel: each one costs something
New peakers
- They start in minutes: they cover the evening ramp.
- More efficient than current peakers.
- They only cover peak hours.
- Expensive if they burn diesel instead of gas.
- They arrive in late 2027.
Permanent gas
- Firm power that replaces 40-year-old plants.
- Gas is cheaper than bunker fuel and diesel.
- Capital, long contracts and years of waiting (2030 or later).
- Tied to the price of gas and to few suppliers.
- Risk of overbuilding (IEEFA).
Utility-scale solar and batteries
- No fuel cost.
- Batteries carry the sun into the evening and reduce peaker use.
- Years of delay in procurement.
- They require more grid investment (LUMA estimates $900 million to $2.6 billion in transmission upgrades; part of them is needed on any path).
- Energy and Water Committee, Puerto Rico Chamber of Commerce: “La luz en Puerto Rico,” narrative v2 (Nov. 2026).
- PREB, Resolution and Order of Sept. 30, 2026.
- EIA: rooftop solar in PR (Apr. 2026).
- IEEFA: fossil fuels in PR (Apr. 2026).
- PR100 (DOE/NREL, 2024); LUMA IRP (Mar. 2026).
- PRFAA: peakers and batteries at Costa Sur (Feb. 2026); Financial Oversight and Management Board: 400 MW temporary generation contract (June 2026); Mintz: procurement of up to 600 MW at Costa Sur (2026); New Fortress Energy: gas supply to Energiza (Jan. 2025).