A cycle that feeds itself.
KNOT 1 OF 6 · ISLAND AND FUELWhy does electricity cost more here?
- There is no cable to another grid: if a plant fails, there is no one to buy from.
- All fuel is imported. 6 of every 10 kWh are made by burning oil.
- On average, a household spends ~8% of its income on electricity; in the U.S., 2.4%. For a retiree with $1,200 a month and a $180 bill, it is 15%.
The price: investment, long contracts and years of waiting.
The price: every oil price spike shows up in the next bill.
Comes from the history: 1954–1982, refining in the south · 1973–1979, oil and subsidy
KNOT 2 OF 6 · PLANTS AND GRIDWhy does the power go out?
- October 2026: on 9 days generation fell short at peak hour. If a plant failed, sectors had to be shut off in rotation.
- With the rate frozen, price was prioritized over investment: from 2012 to 2017, investment was 2.6% of assets a year, versus ~6% at comparable utilities.
- On normal days, excluding major events, most outage hours (8 of every 10 in 2025) come from failures in wires and poles, which LUMA has operated since 2021 and which also deteriorated over decades.
The price: ~22¢ per kWh just to produce it under the latest contract (canceled in 2026), before adding the grid and everything else. Multi-billion-dollar contracts.
The price: outages continue until new plants come online.
Comes from the history: 1989–2016, frozen rate · 2001–2016, political managers · 2017, bankruptcy and Maria
KNOT 3 OF 6 · PUBLIC UTILITYWhat was PREPA used for?
- Besides providing electricity: subsidies, electricity for municipalities, and jobs.
- Each new administration appointed about 200 trusted managers. The result: 10 executive directors in a decade and little continuity.
The price: about 2¢ per kWh for every unsubsidized customer, whatever their income.
The price: about $329 million a year in cuts or taxes, or more if the discounts now built into the base rate are included.
Gives workers a voice and stability. The price: benefits and pensions in the rate.
Less spending on benefits. The price: experience is lost.
Comes from the history: 1941–1972, public utility · subsidies on the bill · 2001–2016, political managers · 2018–2023, LUMA and Genera
KNOT 4 OF 6 · DEBT AND BANKRUPTCYWhat is owed, and to whom?
- Bondholders claim more than $8.5 billion (about $12 billion with interest). The Oversight Board offered $3 billion. There is no agreement.
- Pensions were promised when PREPA had secure revenue. Today they have no fund: they come out of your bill.
The price: several cents more per kWh, for decades (up to 6 to 9¢ in CNE's highest scenario; on a $150 bill, up to $28 to $40 more a month).
The price: more years in court, and PREPA cannot borrow to repair plants in the meantime.
The price: 1.9¢ per kWh, about $9 a month on a $150 bill.
The price: paid by ~10,000 elderly retirees. (Freezing, so that no new benefits accrue, does not lower today's checks.)
Comes from the history: 1989–2016, frozen rate · 2014–2016, end of credit · 2017, bankruptcy and Maria
KNOT 5 OF 6 · THE SUNHow far should we push solar?
- Rooftop solar: from 228 MW (2021) to 1,666 MW (Sept. 2026).
- When your neighbor installs solar, they buy less electricity. But wires, pensions and debt cost the same and are spread over fewer customers. The fixed charge rose from $4 to $8 in July 2026.
The price: paying sooner for batteries and grid equipment. (LUMA estimates $900 million to $2.6 billion in transmission upgrades; part of them is needed on any path.)
The price: tied to the price of gas and to a single supplier.
The price: more than $600 million between now and 2030 for those without solar, according to a preliminary study by the regulator. The solar industry says there is no such cost.
The price: fewer solar installations and fewer homes that can ride out a blackout.
Comes from the history: 2024–2026, solar and a record bill
KNOT 6 OF 6 · FEDERAL MONEYWhat money is coming, and why is it slow?
- Causes of delay: federal reviews, slow reimbursements and disputes among the parties.
- The controls respond to real cases, such as Whitefish (2017).
- Up to $7.6 billion to make the grid more resilient expires in September 2027: whatever is not committed by then may be lost.
The price: more time. At today's pace, the grid would be ready around 2041 (estimate), and part of the delay does not depend on the controls.
The price: greater risk of misuse of funds.
Comes from the history: 2017, bankruptcy and Maria